Earthworks Services

Comprehensive earthworks solutions for railway infrastructure

Our Services

Need Any Help?

If you’re seeking dependable, high-quality earthworks services for rail infrastructure, Invicta Rail is the trusted partner for every project size and scope. Whether it’s a planned upgrade or an urgent stabilisation, we’re here to provide tailored solutions that protect your assets and ensure continued service reliability.

Earthworks Services

At Invicta Rail, we offer a comprehensive and specialised earthworks service tailored to the demanding requirements of railway infrastructure. With years of hands-on experience across a wide range of terrain and structural challenges, we ensure that all earthwork solutions not only meet operational requirements but also uphold the highest standards of safety and reliability. Whether it’s proactive maintenance or urgent response, our team is equipped with the knowledge, tools, and technologies to deliver resilient earthworks throughout the UK rail network.

Earthwork Regrades

Earthwork regrading is essential to the upkeep and safe operation of railway assets. Over time, embankments and cuttings can lose their original profile due to erosion, subsidence, vegetation overgrowth, or water ingress. These changes may lead to instability, posing serious risks to rail services and public safety.

Our earthwork regrading services involve the reshaping and reconstruction of embankments and cuttings to restore their optimal design profile. This includes the removal of unstable materials, re-contouring slopes to safe angles, and improving drainage to manage surface water effectively. Each project is planned with precision, using geotechnical surveys and risk assessments to deliver stable, long-lasting results that meet both modern standards and asset owner specifications.

Reactive Emergency Callout for Stabilisation

When slope failures or ground instability pose an immediate threat to railway operations, Invicta Rail is ready to respond. Our emergency stabilisation teams operate around the clock to assess and address earthworks failures caused by events such as extreme weather, flooding, or landslides.

Rapid mobilisation is key. Upon receiving a callout, our team conducts a swift site assessment, installs temporary supports if needed, and initiates remedial action to contain the affected area. This might include temporary barriers, surface drainage solutions, or soil anchoring. Once the site is secured, a detailed remediation plan is developed to deliver a permanent fix without prolonged disruption to rail services.

Legato Block Installation

For scenarios requiring robust and immediate earth retention, Legato blocks provide a high-performing solution. These large, interlocking precast concrete blocks are ideal for building strong, modular retaining walls that adapt to different load requirements and ground conditions.

Our installation process ensures that Legato blocks are placed securely and aligned precisely, forming gravity walls capable of withstanding substantial soil pressures. They’re particularly effective in tight-access areas and embankments where speed and stability are critical. Their reusability also makes them suitable for both temporary interventions and permanent installations, offering versatility without compromising structural integrity.

Gabion Basket Installation

Gabion baskets are another essential tool in our earthworks portfolio. Filled with stone and wire mesh, they provide flexible, permeable structures that are perfect for embankment stabilisation and erosion control. Their natural appearance also helps them blend seamlessly into the landscape, making them suitable for environmentally sensitive rail corridors.

The installation of gabion baskets by Invicta Rail follows rigorous procedures to ensure maximum effectiveness. Each unit is carefully assembled, filled, and layered to form a robust wall that absorbs water pressure while providing lateral support to slopes. Where needed, they’re combined with geotextiles or vegetation to further enhance slope stability and soil retention.

Embankment Monitoring with Senceive Tilt Sensors

Monitoring embankments is a vital part of managing railway safety. Since 2020, Invicta Rail has installed and maintained remote condition monitoring (RCM) systems across multiple rail corridors. Our expertise lies in the deployment of Senceive triaxial tilt sensors and supporting hardware, providing clients with live data on embankment performance.

These advanced sensors are mounted directly onto embankments or infrastructure, offering continuous data on movement, tilt, and ground shift. This allows for early detection of changes that could lead to failure, giving asset managers the opportunity to intervene before issues escalate. In addition to the tilt sensors, we also install associated power units, communication hubs, and remote alert systems, creating a complete monitoring solution that supports both planned maintenance and emergency response planning.

Why Choose Invicta Rail?

Have Any Questions?

If you’re seeking dependable, high-quality earthworks services for rail infrastructure, Invicta Rail is the trusted partner for every project size and scope. Whether it’s a planned upgrade or an urgent stabilisation, we’re here to provide tailored solutions that protect your assets and ensure continued service reliability.

Our knowledge of railway-specific earthworks is built from years of hands-on experience across diverse environments and soil types.

Fully equipped teams and vehicles are on standby for emergency earthworks interventions.

Each project is tailored to meet unique site conditions, compliance standards, and client goals.

We employ modern monitoring tools and construction techniques to ensure safety, accuracy, and efficiency.

We use materials and methods that reduce environmental impact and promote long-term structural health.

Integrated Earthworks Management

Invicta Rail’s approach to earthworks is not only reactive but also preventative. We integrate modern surveying techniques, digital modelling, and data analysis to identify potential issues before they become serious threats. Our collaborative planning process includes geotechnical specialists, engineers, and on-the-ground operatives, all aligned to provide safe and efficient solutions for every site.

We pride ourselves on minimising disruption to rail operations. All work is carried out with meticulous attention to detail, including phased construction, night and weekend work, and clear communication with stakeholders to maintain uninterrupted service where possible.